Fire Main Pre-Flush and Bag Test ACSA Approval Request

Address of Proposed Test(Required)
Required Flow Rate (GPM) for 10 FT/S velocity
Proposed Date of Pre-Flush(Required)
Proposed Time of Pre-Flush(Required)
:
Proposed Date of Bag Test(Required)
Requires County Inspector scheduling by Contractor
Proposed Time of Bag Test(Required)
Requires County Inspector scheduling by Contractor
:

en_USEnglish